Line 2 of the Chengdu Metro (Chinese: 成都地铁2号线; pinyin: Chéngdū Dìtiě Èr Hào Xiàn) is the second line on the metro network in Chengdu, Sichuan. Line 2 is a crosstown northwest-southeast trunk route. This line serves the Chengdu East railway station. Line 2 began operation on September 16, 2012.[3] An 11 km long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014.[4]
Opening timeline
Stations
Est. Completion
References
The information in this article is mostly based on that in its Chinese equivalent.
^戴璐岭 (2018-09-22). "400万!成都地铁线网单日客运量再次刷新纪录". 四川新闻 (in Chinese). Retrieved 2018-10-14.
^"成灌快铁犀浦站正式开建". 成都市官方网站. 2009-08-26. Archived from the original on 2014-04-24. Retrieved 2013-08-08.
^成都地铁2号线今日正式开通试运营. Archived from the original on December 19, 2012. Retrieved September 16, 2012.