Line 2 is a north-south line of Suzhou Rail Transit. It passes through five districts of Suzhou, and has 22 stations, 17 underground and 5 elevated. It began operations on December 28, 2013.

History

The line was opened in two phases, with the 26.557 km (16.502 mi) long first phase from Suzhou North Railway Station to Baodaiqiao South (宝带桥南) near Baodai Bridge started operations on December 28, 2013. This section consisted of 6.57 km (4.08 mi) of elevated track and 19.146 kilometres (11.897 mi) of underground track.[1]

The 14.347 km (8.915 mi) second phase, running from Qihe to Fuxiang Lu in the north, and from Yinzhong Lu (尹中路) to Sangtiandao (桑田岛) in the east, commenced trial operations on September 24, 2016.[2]

A north extension to Aigehao Road is under construction, and it's expected to open in 2026.

Opening timeline

Stations

Interchange signage in Guangji Nanlu station
Platform of Dushuhu Neighborhood Center station

Operations

Intervals

[3]

Rolling stock


References

  1. ^ 2号线施工6月底结束 12月28日试营运. 扬子晚报 (in Chinese). March 25, 2013. Archived from the original on February 25, 2013. Retrieved February 22, 2013.
  2. ^ "终于定了!苏州轨交2号线延伸线明天正式开通". 新华报业网. September 23, 2016.
  3. ^ "轨交二号线运输方案昨发布一号线将适当调整" (in Chinese). 搜狐. Retrieved December 26, 2017.