Taipei Main Station (Chinese: 台北車站; pinyin: Táiběi chēzhàn) is a major metro and railway station in the capital Taipei, Taiwan.[13] It is served by Taipei Metro, the Taiwan High Speed Rail, and Taiwan Railway. It is also connected through underground passageways to the terminal station of Taoyuan Airport MRT and the Taipei Bus Station. It is the busiest station in Taiwan.
The central building of Taipei Main Station is a rectangular building in Zhongzheng District with six stories above ground and four stories below ground. The building is 149 m (488 ft 10 in) long and 110 m (360 ft 11 in) wide. The first floor has a large ticketing hall with a skylight and three ground-level exits in each cardinal direction, the second is occupied by restaurants managed by the Breeze group, and all floors above are office spaces. At the B1 level, there are turnstiles for the TR and THSR platforms, along with a myriad of underground passageways for Taipei Bus Station, the Taoyuan Metro station, and Beimen metro station. Zhongshan Metro Mall, Taipei City Mall, Station Front Metro Mall, and Qsquare all connect on this level as well. TRA and THSR each have two island platforms at the B2 level. As for Taipei Metro, the Bannan line's platforms are located at the south of the station building; the entrances are at the B2 level, and the platforms are at B3. The Tamsui-Xinyi line's entrance is directly under the station building at B3, and the platforms are at B4.[14][15][16]
HSR services 1xx, (1)2xx, (1)3xx, (1)5xx[a], (1)6xx, and (8)8xx call at this station. The first two southbound trains in the day are 803 (stops at all stations) at 06:26 and 203 (Taipei-Banqiao-Taichung-Chiayi-Tainan-Zuoying) at 06:30. Service 203 is the only train of the day that departs from Taipei Station, and does not depart from Nangang station like most southbound trains do. Although Service 203 departs four minutes later after Service 803, passengers traveling to major cities such as Taichung, Tainan, and Kaohsiung will save more time taking Train No. 203, while Train No. 803 would be more suitable for traveling to nearby cities such as Taoyuan or Hsinchu.
The first rail station in Taipei was completed in Twatutia in 1891, during Qing rule, when the railway to Keelung was opened for service.[17][18] Initially, a temporary station was built while a permanent station was constructed in 1897, during Japanese rule (1895–1945). In 1901, the station was located to the east of its current location. It was rebuilt in 1940 to accommodate growing passenger traffic.
To alleviate traffic congestion caused by railroad crossings in downtown Taipei, an underground railway tunnel between Huashan and Wanhua was built along with the present station building as part of the Taipei Railway Underground Project.[19] When the underground system was completed on 2 September 1989, railway service was moved to the newly completed building (completed on 5 September 1989) and the old building as well as a temporary station were demolished.
The current station was further expanded with the opening of the Taipei Metro. The metro station is connected to the basement of the railway station and opened to passenger traffic in 1997 to the Tamsui–Xinyi line. It became a massive transfer hub with the opening of the Bannan Line in 1999. Extensive underground malls now exist at the front and back of the station,[20] which emulate those found in Tokyo and Osaka, Japan. The station also became a terminus for Taiwan High Speed Rail trains when the network began service in 2007.
Taipei station and the area surrounding it have been undergoing renovation since 2005. Japanese architect Fumihiko Maki was chosen to design two skyscrapers that will surround the railroad station.[21] Maki will also oversee the renovation of Taipei station. The height of the taller tower will be 76 stories, whereas the shorter tower will be 56 stories.[22] The two skyscrapers will be constructed on empty parcels found adjacent to Taipei station, above the Taoyuan Airport MRT station.
The station interior underwent renovation work from February to October 2011.[23] Basement restrooms were renovated, the basement and first floor preparations for additional Breeze Plaza retail space began, the large ticket office in the first floor lobby was removed, and additional retail space was allocated.[23] In addition, the flooring on the first floor was completely replaced, fire and evacuation regulations were improved, and solar panels will be installed on the station roof.[23]